Australia, Melbourne - au/32

Metro


John Holland from Melbourne has won the contract to deliver the EUR218.16m (AUD324m) early works package for Melbourne Metro, including excavating massive shafts in the centre of Melbourne as part of preparations for the tunnel and five new underground stations. The contract will involve excavation of huge open shafts up to 35m deep and adjacent to Swanston Street to enable the underground construction of the two new city stations built as part of the EUR7.33 billion (AUD10.9b) project.


Excavation of the Central Business District (CBD) North Station will involve 2 shafts – at Franklin and A’Beckett Street – which will be covered by massive acoustic sheds to reduce noise for neighbouring residents and offices. Construction of CBD South will involve the partial demolition of the carparkunderneath City Square. Other works in the package include the relocation and protection of up to 100 utilities, including gas, power and telecommunications services, and the 120 year old brick main sewer line under the Domain interchange. These works will start within weeks, with work on the stations shafts to begin next year, following the conclusion of Environment Effects Statement (EES) process which is currently underway and formal planning approval for the project. Visitwww.melbournemetro.vic.gov.auhttp://www.premier.vic.gov.au andhttp://www.johnholland.com.au. 26/16.

Useful Links:-
http://melbournemetro.vic.gov.au/about-the-project/news/major-work-to-begin-next-year

http://www.premier.vic.gov.au/major-work-on-metro-tunnel-to-begin-next-year/

http://www.johnholland.com.au/who-we-are/latest-news/john-holland-to-deliver-early-works-for-melbourne-metro



Permalink

Australia, Sydney - au/11

Railways Metro

The three groups Lorth JV (a joint venture between Laing O'Rourke Australia Construction Pty Ltd and John Holland Pty Ltd), Metconnect (a joint venture between Downer EDI Engineering Power Pty Ltd and RCR O’Donnell Griffin Pty Ltd) and Systems Connect (a joint venture between UGL Engineering Pty Ltd and CPB Contractors Pty Ltd) have been shortlisted for the Metro line-wide works which includes laying tracks in the 15.5 km tunnels from Chatswood to Sydenham, installing electrical systems including substations, constructing Sydney Metro Trains Facility South and converting the existing Bankstown Line to allow metro trains to run.

The NSW Government expects to award the contracts later this year.

Sydney Metro services start in the first half of 2019 on the Sydney Metro Northwest project, with metro rail to be extended in 2024 under Sydney Harbour, through the CBD and beyond to Bankstown. Visit https://www.sydneymetro.info/article/groups-shortlisted-two-major-sydney-metro-contracts.

11/18



Permalink

The NSW Government awarded the EUR877,93 million (AUD1.376 billion) contract to Systems Connect (as an unincorporated Joint Venture between CPB Contractors and UGL) for the extension of the new metro railway into the CBD and beyond to Bankstown, between Chatswood and Sydenham in Sydney.

The contract includes 31 km of underground railway track to be laid in the twin railway tunnels from Chatswood to Sydenham; 31 km of overhead power equipment and 11 new substations to power the metro from Chatswood to Bankstown; Installation of over 350km of high voltage, low voltage and tunnel service cabling; Connecting the railway tracks from the end of Sydney Metro at Chatswood to the new tracks  into the city; the expansion of the Sydney Metro Trains Facility at Rouse Hill to accommodate 37 new trains for Sydney Metro City & Southwest; the construction of the Sydney Metro Trains Facility - South at Marrickville; the  installation of tunnel equipment such as ventilation, drainage and emergency evacuation and monitoring equipment as well as the fit out of the tunnel ventilation and high voltage equipment in the seven new underground stations.

This is the seventh Sydney Metro City & Southwest contract to be awarded.

Visit https://www.sydneymetro.info  and https://www.transport.nsw.gov.au.

48/18.

Additional links:-

https://www.sydneymetro.info/article/1376-billion-line-wide-contract-awarded

https://www.transport.nsw.gov.au/news-and-events/media-releases/metro-on-track-as-1376-billion-contract-awarded



Permalink

The NSW Government has awarded the EUR877,93 million (AUD1.376 billion) contract to Systems Connect (as an unincorporated Joint Venture between CPB Contractors and UGL) for the extension of the new metro railway into the CBD and beyond to Bankstown, between Chatswood and Sydenham in Sydney.

The contract includes 31 km of underground railway track to be laid in the twin railway tunnels from Chatswood to Sydenham; 31 km of overhead power equipment along with 11 new substations to power the metro from Chatswood to Bankstown; Installation of over 350km of high voltage, low voltage and tunnel service cabling; Connecting the railway tracks from the end of Sydney Metro at Chatswood to the new tracks  into the city; the expansion of the Sydney Metro Trains Facility at Rouse Hill to accommodate 37 new trains for Sydney Metro City & Southwest; the construction of the Sydney Metro Trains Facility - South at Marrickville; the  installation of tunnel equipment such as ventilation, drainage and emergency evacuation and monitoring equipment as well as the fit out of the tunnel ventilation and high voltage equipment in the seven new underground stations.

This is the seventh Sydney Metro City & Southwest contract to be awarded.

Visit https://www.sydneymetro.info  and https://www.transport.nsw.gov.au.

48/18.

additional links:-

https://www.sydneymetro.info/article/1376-billion-line-wide-contract-awarded

 

https://www.transport.nsw.gov.au/news-and-events/media-releases/metro-on-track-as-1376-billion-contract-awarded





Permalink

Austria

Austria, Styria & Carinthia - at/42

High Speed Railway

Closing Date: 21.12.2009 (Tender Closed)

Restricted procedure, deadline 21.12.2009, for construction of power equipment on Weitendorf - Wettmannstetten section on the Koralm line between Graz and Klagenfurt, including the 1,695 m Hengsberg tunnel. Contact OEBB-Infrastruktur AG, Mr. Ramazan Gürkan, Vienna, tel +43 424.293.000-4.747, fax +43 424.293.000-4.669, e-mail ramazan.guerkan@oebb.at. Visit http://ted.publications.eu.int/udl?request=Seek-Deliver&language=en&docid=338476-2009. 51/09.



Permalink

Austria, Vienna - at/34

High Speed Railway

Closing Date: 21.10.2009 (Tender Closed)

Invitation to tender by negotiated procedure, deadline 21.10.2009, for ancillary works for electricity power lines on the Vienna-St Polten-Wienerwald line, including the 11.64 km-long Wienerwald tunnel. Contract duration 01.02.2010 - 21.12.2012. Contact Matthias Müller at Oebb-Infrastruktur Bau Aktiengesellschaft, Engineering Services /Energietechnik, Projektmanagement Sankt Pölten, in Vienna, tel +43 274293000-3362, fax -3370, e-mail matthias.mueller@oebb.at. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=275341. 41/09.



Permalink

Bhutan

Bhutan, Trongsa district - bt/14

Hydro


Hindustan Construction Company Ltd (HCC) has been awarded a US$68.5 million (INR4.56 billion) EPC contract from the Tangsibji Hydro Energy Ltd of Bhutan for constructing the Nikachhu Hydropower Project in in Tangsibji Gewog,Trongsa district. The dam site is located in Lorim which is 6km downstream from the Chendibji chorten. A design discharge of 25.45m3/s is to be diverted through a 4 m finished diameter head race tunnel which is 12,144 m long and goes through two turbines in  the Power House generating a capacity of 118MW.The water is then discharged into the reservior of Mangdechhu Hydropower Project. For further information visit http://www.hccindia.com/hcc_admin/data_content/pdf_files/Press_Release_-_Nikachhu_HEP_and_Sawalkot_tunnel_order_.pdf. 13/16.




Permalink

Bosnia and Herzegovina

Bosnia and Herzegovina, National - ba/15

Railway

Closing Date: 20.11.2014 (Tender Closed)

Prior Information Notice, deadline 20.11.2014, for track overhaul including reconstruction of the permanent way, track formation and structures, tunnel rehabilitation, station signalling and level crossings, reconstruction of power traction substations and overhead contact line on key sections of the railways on Corridor 5c Sarajevo-Bradina; for purchase and installation of signalling equipment, electrical works, telecommunication and station interlocking system along the route Banja Luka-Doboj. Tendering for any goods, works and services is expected to start in first quarter of 2014. Contact Dragan Calovic, BHRPC – Project Implementation Unit, Doboj, tel +387 53 201 000, +387 33 223 099, fax +387 53 241 788; +387 33 223 098, e-mail bhzjkdo@teol.net and dragan.calovic@zfbh.ba. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=397053-2013. Project n. 7230-GPN-35418. 49/13.



Permalink

Canada

Canada, Vancouver - ca/29

Light Rail

SNC-Lavalin will work with the BC government to finalize the agreement to design, build and finance the EUR1.07 bn Evergreen Line Rapid Transit project, opening mid-2016. The 11 km-long line will link the cities of Burnaby, Port Moody and Coquitlam. The project comprises elevated and at-grade guideways, a 2 km-long bored tunnel, seven stations, power substations, train operating systems, parking facilities, and a vehicle storage and light maintenance facility. Visit http://www.evergreenline.gov.bc.ca/documents/NewsReleases/2012TRAN0090-001491.pdf. 41/12.



Permalink

Canada, British Columbia - ca/21

Hydropower

A feasibility study has been handed to Coast Mountain Power Corp. for the Forrest Kerr hydroelectric project. Upon completion, the scheme will consist of a 3.2 km-long, 6 x 8 metre water tunnel designed to deliver up to 130 cu m/second of water to three 33.3 megawatt turbine generators and a 188 km-long D.C. light transmission line from the site to Meziadin junction. The total project cost is estimated to be $195 million. 15/02.Coast Mountain Power Corp. has selected the Thyssen Mining / Ostu Stettin JV as the preferred contractor for the tunnelling and underground excavation of the Forrest Kerr hydroelectric project water tunnels and powerhouse. The Forrest Kerr project is located in the Iskut River approximately 100 km north of Stewart in northwest British Columbia. A contract is being negotiated which would see activity commence in January 2005. The period leading up to on site work would entail equipment selection, mobilisation, site preparation and portal construction. Electricity will be generated by three 33.3 MW turbine generators and one 12 MW turbine generator. The water to drive the turbines will be drawn from the Iskut River and directed to the powerhouse through a 6 m-diameter 3.2 km-long water tunnel and returned to the river immediately below the powerhouse. It is anticipated the water tunnel and powerhouse excavation will be completed within 14 months. Visit www.thyssenmining.com 42/04.



Permalink

China

China, Tianjin - cn/33

Metro

  The Tianjin metro, when it opened in 1974, was the second largest in China with a length of 7.4 km. Extension with total length of 10.24 km has been financed under an Australian government loan of $110 million, of which 15 % was allocated for overseas purchase of vehicles, signalling, communication and power equipment. Total investment is $384.6 million, of which $276.9 million is from domestic sources. More information from Geng Shengli, Tianjin Municipality, Bldg 5, 12 Qu, Heping Jie, Dongcheng District, Tianjin, China 100013, tel +86 22 421 6482, fax 421 3017. Also undergoing feasibility studies is Tianjin Suburban Line 1 with a total length of 60 km. November 1999.   Construction starting on $830 million project to extend existing 7.4 km-long line 1 to 26 km with 48,000 pax/h capacity. Completion by December, 2005. www.xinhua.cn 33/01.  Planning and design work for Lines 2 and 3 of the Tianjin metro has been completed and construction is expected to commence soon. Line 2 will be 22.5 km-long and will run from east to west and 20.3 km of the line will be underground. Of 20 stations, 18 will be built below ground.The 28.4 km Line 3 will run from north to south and 20 km of track will be underground. 2.2 km will be built at ground level and 6.2 km will be on elevated viaducts. There will be a total of 22 stations with three on elevated platforms, 17 underground and two on ground level. 28/03.



Permalink

Colombia

Colombia, North Kivu & South Kivu - co/11

Hydro

Closing Date: 12.01.2022 (Tender Closed)

Restricted invitation to tender, deadline 12/01/2022, for the Ruzizi III EPC (engineering, procurement, construction) Turnkey Contract -Initial Selection. The Ruzizi III Regional Hydroelectric Power Plant, will be located on the Ruzizi River, at the border between (DRC- Democratic Republic of the Congo) and Rwanda. It will be part of the Ruzizi Cascade, already equipped by Ruzizi I and Ruzizi II projects, and will be located approximately 13 km downstream of the Ruzizi II dam. The contract includes the construction of a 3.8 km long, 6.7 m diameter, concrete-lined headrace tunnel from the dam reservoir to the powerhouse. Value of the contract is EUR 436 million, excluding VAT. Duration of the contract will be56 months. Tenders must be sent to Ruzizi III Energy Ltd, attn Luciano Canale, Kigali, tel +25 0786674578, email luciano.canale@ruzizienergy.com. Contact Ruzizi III Energy Ltd, attn Lonceny Magassouba, Kigali, tel +224 622676247, email RuziziIII_EPC_InitialSelection@ruzizienergy.com. Visit http://ted.europa.eu/udl?request=Seek-Deliver&language=en&docid=575634-2021. 46/21.

Rwanda-Kigali: Hydro-electric plant construction work

2021/S 220-575634

Contract notice

Works

Legal Basis:

EIB Guide to Procurement - Financed by the EIB

Section I: Contracting authority

I.1)

Name and addresses

Official name: Ruzizi III Energy Limited

Postal address: Sanlam Towers, Wing 4A, 4th Floor, KN 67 St 10

Town: Kigali

NUTS code: RW Rwanda

Postal code: 3300

Country: Rwanda

Contact person: Luciano Canale (Project Director)

E-mail: luciano.canale@ruzizienergy.com

Telephone: +25 0781553634

Internet address(es):

Main address: www.ruzizi-iii.com

I.3)

Communication

Access to the procurement documents is restricted. Further information can be obtained at:

Additional information can be obtained from another address:

Official name: Ruzizi III Energy Limited

Postal address: Cité chemin de fer, Commune de Kaloum, BP : 1463

Town: Kigali

NUTS code: RW Rwanda

Postal code: Rue KA 050

Country: Rwanda

Contact person: Loncény MAGASSOUBA

E-mail: RuziziIII_EPC_InitialSelection@ruzizienergy.com

Telephone: +224 622676247

Internet address(es):

Main address: www.ruzizi-iii.com

Tenders or requests to participate must be submitted to the following address:

Official name: Ruzizi III Energy Limited

Postal address: Sanlam Towers, Wing 4A, 4th Floor, KN 67 St 10

Town: Kigali

Postal code: Rue KA 050

Country: Rwanda

Contact person: Luciano Canale

Telephone: +25 0786674578

E-mail: luciano.canale@ruzizienergy.com

NUTS code: RW Rwanda

Internet address(es):

Main address: www.ruzizi-iii.com

I.4)

Type of the contracting authority

Other type: Private company (SPV)

I.5)

Main activity

Other activity: Electricity

Section II: Object

II.1)

Scope of the procurement

II.1.1)

Title:

Ruzizi III EPC Turnkey Contract – Initial Selection

II.1.2)

Main CPV code

45251120 Hydro-electric plant construction work

II.1.3)

Type of contract

Works

II.1.4)

Short description:

The Ruzizi III Regional Hydroelectric Power Plant will be located on the Ruzizi River, at the border between DRC and Rwanda. It will be part of the Ruzizi Cascade, already equipped by Ruzizi I and Ruzizi II projects, and will be located approximately 13 km downstream of the Ruzizi II dam.

II.1.5)

Estimated total value

Value excluding VAT: 436 000 000.00 EUR

II.1.6)

Information about lots

This contract is divided into lots: no

II.2)

Description

II.2.3)

Place of performance

NUTS code: RW Rwanda

Main site or place of performance:

The Ruzizi III Regional Hydroelectric Power Plant will be located on the Ruzizi River, at the border between DRC and Rwanda. It will be part of the Ruzizi Cascade, already equipped by Ruzizi I and Ruz

II.2.4)

Description of the procurement:

This is the Initial Selection process for the Ruzizi III Regional Hydroelectric Power Plant EPC contract. The contract will include the engineering, procurement, construction, testing and commissioning of a 45 m height embankment dam with associated spillway, low level outlet, and eco-flow small-hydro, a 3.8 km long, 6.7 m diameter, concrete-lined headrace tunnel from the dam reservoir to the powerhouse, penstock and unit penstocks, power station and switchyard, a 7.3 km long 220 kV double-circuit transmission line connecting the Ruzizi III substation to the regional dispatch station in Kamanyola (DRC), access roads from Bugarama (Rwanda) and Kamanyola (DRC) to the dam site, and all ancillary and related works. The power station will have three generating units and an eco-flow small-hydro, giving an installed capacity of 206 MW.

II.2.5)

Award criteria

Price is not the only award criterion and all criteria are stated only in the procurement documents

II.2.6)

Estimated value

Value excluding VAT: 436 000 000.00 EUR

II.2.7)

Duration of the contract, framework agreement or dynamic purchasing system

Duration in months: 56

This contract is subject to renewal: no

II.2.10)

Information about variants

Variants will be accepted: no

II.2.11)

Information about options

Options: no

II.2.13)

Information about European Union funds

The procurement is related to a project and/or programme financed by European Union funds: no

II.2.14)

Additional information

Section III: Legal, economic, financial and technical information

III.1)

Conditions for participation

III.1.2)

Economic and financial standing

Selection criteria as stated in the procurement documents

III.1.3)

Technical and professional ability

Selection criteria as stated in the procurement documents

Section IV: Procedure

IV.1)

Description

IV.1.1)

Type of procedure

Restricted procedure

IV.1.3)

Information about a framework agreement or a dynamic purchasing system

IV.1.8)

Information about the Government Procurement Agreement (GPA)

The procurement is covered by the Government Procurement Agreement: no

IV.2)

Administrative information

IV.2.2)

Time limit for receipt of tenders or requests to participate

Date: 12/01/2022

Local time: 14:00

IV.2.3)

Estimated date of dispatch of invitations to tender or to participate to selected candidates

IV.2.4)

Languages in which tenders or requests to participate may be submitted:

English, French

Section VI: Complementary information

VI.1)

Information about recurrence

This is a recurrent procurement: no

VI.3)

Additional information:

The Borrower (“the Contracting States (Burundi, Democratic Republic of Congo (DRC), Rwanda) and Ruzizi III Energy Limited (REL)”); REL a special purpose company who is going to be owned by Industrial Promotion Services and SN Power (owned by Scatec ASA) and the Contracting States.

The Borrower has currently secured from the African Development Bank, approval for part of the funding for the 206 MW (203 MW for the main powerhouse and 3 MW for the small-hydro on the ecological flow). In addition, the Borrower is currently negotiating the remaining financing from a number of other multilateral development banks, including the World Bank (WB), European Investment Bank (EIB), Kreditanstalt für Wiederaufbau (KfW), the French Development Agency (AFD), and the European Union (EU). This funding will be used towards the cost of developing the project, and the Borrower intends to apply part of the proceeds to payments for goods, works, and services to be procured under this project.

In this regard, Ruzizi III Energy Limited intends to initial select contractors and consortia to tender for the RIII-EPC contract. Initial Selection documents will be made available, in electronic format for free, in a dedicated electronic system. Interested applicants may request access to the electronic system by sending an email to the following address: RuziziIII_EPC_InitialSelection@ruzizienergy.com.

All queries related to the Initial Selection process should be sent via email to the following email address: RuziziIII_EPC_InitialSelection@ruzizienergy.com.

The RIII-EPC contract is planned to be tendered in Q4 2022 with work commencing in Q1 2023.

VI.4)

Procedures for review

VI.4.1)

Review body

Official name: Ruzizi III Energy Limited

Town: Kigali

Country: Rwanda

VI.5)

Date of dispatch of this notice:

09/11/2021



Permalink